Vegas time: 7:34 PM
The LVCC Loop system — a three-station transportation system consisting of 1.7 miles of tunnel — was built in approximately one year (using the now-legacy Godot Tunnel Boring Machine). LVCC Loop's cost was approximately $47M (firm fixed pricing) for the two tunnels and three stations (two surface and one subsurface). Tunneling occurred during large conventions (>100,000 attendees pre-COVID) with zero road closures and zero attendee disturbances.
LVCC Loop connects the LVCC New Exhibit Hall with the existing campus (North/Central/South Halls), and reduces a 45 minute cross-campus walk time to approximately 2 minutes.
To no one’s surprise, Elon Musk’s Boring Company is in the news again as Steve Hill, CEO of the Las Vegas Convention and Visitors Authority, throws his support behind the Vegas Loop’s expansion amid safety concerns. Also, a member of the Nevada System of Higher Education Board of Regents is facing calls to resign after doubling down on comments aimed at trans athletes and the American Film Market moving to Vegas revives hopes for a Hollywood 2.0. Hosts Sarah Lohman and Dayvid Figler are joined by thelist.vegas publisher Andrew Kiraly to round up this week’s news. We’re on social media! Follow us @CityCastVegas on Instagram. You can also call or text us at 702-514-0719. Want some more Las Vegas news? Then make sure to sign up for our morning newsletter here. Learn more about your ad choices. Visit megaphone.fm/adchoices
Today's episode is very funny and you will enjoy it, or will you????? https://www.bettyinthesky.net/
, ,
Visit the official website for more information