The LVCC Loop system — a three-station transportation system consisting of 1.7 miles of tunnel — was built in approximately one year (using the now-legacy Godot Tunnel Boring Machine). LVCC Loop's cost was approximately $47M (firm fixed pricing) for the two tunnels and three stations (two surface and one subsurface). Tunneling occurred during large conventions (>100,000 attendees pre-COVID) with zero road closures and zero attendee disturbances.
LVCC Loop connects the LVCC New Exhibit Hall with the existing campus (North/Central/South Halls), and reduces a 45 minute cross-campus walk time to approximately 2 minutes.