The LVCC Loop system a three-station transportation system consisting of 1.7 miles of tunnel was built in approximately one year using the now-legacy Godot Tunnel Boring Machine. LVCC Loop's cost was approximately $47M for the two tunnels and three stations (two surface and one subsurface). Tunneling occurred during large conventions (100,000 attendees pre-COVID) with zero road closures and zero attendee disturbances. LVCC Loop connects the LVCC New Exhibit Hall with the existing campus (North/Central/South Halls), and reduces a 45 minute cross-campus walk time to approximately 2 minutes.
3150 Paradise Rd
Las Vegas, NV 89109
The VegasNearMe app lists thousands of videos and podcasts for all the biggest and most exciting shows in Las Vegas
Find more videos and podcasts in the VegasNearMe app!Tickets for all major events are available now!
Call the Rebel Tickets VegasNearMe ticketing line at 725-325-1036